Preserve Zelino’s buildings
Surveys, design, cost estimates and emergency stabilisation for all buildings in the complex.
Loading fundraising information…
Building cost estimates
Estimates will be published once specialists determine the work quantities and costs. Preparation and physical works are accounted for separately.
| Building | Preparation | Works |
|---|---|---|
| Boiler house | Not determined | Not determined |
| Gatehouse | Not determined | Not determined |
| Production shop no. 1 | Not determined | Not determined |
| Production shop no. 2 | Not determined | Not determined |
| Production shop no. 3 | Not determined | Not determined |
| Warehouse no. 1 | Not determined | Not determined |
| Warehouse no. 2 | Not determined | Not determined |
| Pumping station | Not determined | Not determined |
| Fire shed | Not determined | Not determined |
| Stable | Not determined | Not determined |