Menu

Project status

Work status

A concise summary of completed, current and planned work.

Public work status

Current project status

Research, heritage work, building review, infrastructure preparation and professional collaboration are continuing.

  • Completed
  • In progress
  • Planned
In progress

Research and archive

Work timeline

Completed
  1. The main materials were systematised

    The sources were brought together in one research record.

In progress
  1. Source review continues

    The evidence is being compared across sources and historical context.

Completed
  1. Evidence map of the supply system published

    The supply map shows 24 documented points, with research hypotheses kept separate from established facts.

  2. A new layer of Zalino’s estate history was identified

    Archival materials connected further research into Zelino Park with the documented estate of E. I. Zhukova and M. I. Pleskovskaya; a historical and cartographic study of the estate landscape is being developed.

  3. Conditions for obtaining historic plans were clarified

    The archive reported that its equipment cannot scan the oversized plans; copies of these plans have not yet been received.

In progress
  1. An archival file is undergoing conservation

    The archive reports that conservation of the file requested for estate research is estimated to take one and a half months; its availability date has not been confirmed.

Planned
  1. Repeat the copying request

    Following the archive’s recommendation, a repeat request is planned for late October 2026 to check availability after conservation; it has not yet been sent.

In progress

Heritage and protection

Work timeline

Completed
  1. Heritage-record information was received

    The material was incorporated into the project review.

In progress
  1. The conservation approach is being clarified

    The material is being assessed alongside the historical and technical evidence.

Planned
  1. Define the next stage of work

    The next stage is to clarify the overall conservation requirements.

In progress

Buildings and conservation

Work timeline

Completed
  1. Building information was systematised

    The main documentary material was assembled in the working record.

In progress
  1. Building review continues

    Records and observations are being compared to establish priorities.

Planned
  1. Prepare the next survey stage

    The next stage is to continue studying the buildings and their conservation needs.

In progress

Access and infrastructure

Work timeline

Completed
  1. Infrastructure preparation began

    Initial material on access and infrastructure was assembled.

In progress
  1. Access and connections are being considered

    The basic options for access and infrastructure are under review.

Planned
  1. Continue infrastructure preparation

    The next stage is to refine the overall approach to access and infrastructure.

In progress

Professional collaboration

Work timeline

Completed
  1. The main areas of collaboration were defined

    A working map of relevant organisations and opportunities was prepared.

In progress
  1. The first targeted outreach wave is being prepared

    Separate draft approaches are being prepared for ten groups of relevant organisations and specialists; dispatch has not been confirmed.

Planned
  1. Approve each dispatch separately

    The next stage is to verify each addressee and attachment set and make a separate dispatch decision, without a mass mailing.

Careful restoration of the neighbouring estate park is a project goal. The current stage concerns research into the natural and historical landscape; it does not announce the start of physical works.

Historical and cartographic research into the estate and park