Architectural visualisation of production building no. 2 based on a photograph dated 22 March 2026

Loading fundraising information…

Plans and documents

Floor plans

Key characteristics

Area
532.7 m²
Area
Factory grounds
Materials
Floor plans available

The owner confirmed the dangerous condition on 27 October 2026. An engineering report has not yet been obtained.

Address
171351, Tver Region, Staritsa, Zelino Territory
Number of floors
2
Area in the technical passport
532.7 m²

Technical passport details

Technical passport for production building no. 2, 24 April 2007; These details describe the building on the document date and do not establish its current condition.

Room schedule

Basement floor

No.RoomPurposeArea, m²
1Warehouse—33.9
2Warehouse—128.2
3Warehouse—37.2
4Warehouse—58.1
Floor total257.4

First floor

No.RoomPurposeArea, m²
1Production shop—21.9
2Warehouse—16.4
3Corridor—19.1
4Warehouse—40.3
5Production shop—130.7
6Warehouse—35.9
7Corridor—1.8
8Changing room—3.5
9Shower room—5.7
Floor total275.3

Areas and volumes

Building partFootprint, m²Height, mVolume, m³
Main building346.55.31,836
Extension22.52.761
Additional extension12.3——

Structures and recorded condition

ElementConstructionCondition in the documentWear, %
FoundationsRubbleCracks and weathered joints55
Walls and partitionsBrickCracks and weathering60
Intermediate floor structuresReinforced concreteCorrosion and signs of leaks55
Attic floor structureTimberSigns of leaks and rot—
RoofAsbestos-cement sheetsNot stated55
FloorsTile and concreteCracks and weathering50
DoorsPanelledSagging65
WindowsCasementDried frames and partial loss of glazing65
FinishesPlaster and whitewashCracks and delamination55
PorchStoneCracks and chips50

Overall wear in the technical passport

  • Building as a whole: 57%