Menu

Public conservation register

Technical records for raw-material warehouse 2

Check six technical-record sheets for the warehouse.

BTI: raw-material warehouse 2

PREPARATION

Result and purpose

Check six technical-record sheets for the warehouse.

Cost being determined. Fundraising is not yet open.

Basis and current stage

This line covers the warehouse, not production building 3. Copies held and payment are unverified.

Price source

RUB 2,352 for six sheets; with production buildings 1/2 this makes the historic RUB 7,333 / 19-sheet figure.

A historic price or personal payment is not an ANO receipt and does not open a repeat campaign for an acquired material.

Return to this register item →

Support the selected goal

You are supporting: BTI: raw-material warehouse 2 — Technical records for raw-material warehouse 2

Fundraising for this item is closed. Payments open after the goal, budget and reporting terms are published.